Model
|
Division
|
Activities
|
|
Netlist Sign-Off
|
Front-end |
1. Netlist Check
2. Layout Interface (Floorplan / CTS Review)
3. Analog Floorplan Review
4. ESD Review
5. Package Review & Bonding Simulation
6. Clock Optimization
7. Equivalence Check (Original Netlist to
CTS Netlist)
8. MTTV Fix
9. Multi Power LVS Netlist Generation
10. Test Vector Backannotation
11. Design Review Meeting
12. Issue Traveller Sheet
13. Register Device / Bonding / Test
Specifications
14. Support Test Failure Analysis
15. Support Mass Production
16. Support Front-end Engineering Inquiry |
| Back-end |
1. TDL or Non-TDL
Auto P&R
2. Verification
3. PG |